Related Digital; general contractor Walbridge; anchor tenant Oracle
Location
Eight parcels, north side of Michigan Avenue, Saline Township, Washtenaw County
Site size
~575 acres total; ~250-acre developed footprint
Planned capacity
1,383 MW across three 550,000 sq ft data halls
Project status
Under construction since November 2025. Three challenges live: AG appeal of MPSC Case U-21990, a State Tax Commission challenge, and a pending EGLE discharge permit.
Announced investment
Announced figure moved $7B → $16B → $43B
Serving utility
DTE Energy: MPSC Case U-21990
Key investors
Equity: Related Companies and Blackstone. Debt anchored by PIMCO.
OpenAI is a compute offtaker via Oracle. No evidence of OpenAI equity in the asset itself.
Coordinates
Not established
Last updated 7 September 2026. Public record reviewed through this date; digital layer
from the most recent pull. This market is on a periodic refresh cadence.
Member markets are re-scored on a set schedule.
Sentiment
29/100
NegativeNot approvedunder challenge by the developer
Half of resamples fall between 28 and 30. Differences smaller than that are not meaningful.
Loudness
89Very loud · 94 normalized, 148 per 10,000 residents, the basis on which this market compares to another
Scope
Concern sits at county; the venue acting on it is state.
hyper-local›county›regional›state›national
Scope mismatch. The harm is felt more locally than the fight is being conducted. Local engagement cannot resolve this on its own, because the decision has moved above the level at which a community agreement would bind.
Veto point
BindingThe Township Board did deny the rezoning on 9/10/2025 and later rescinded it on 1/28/2026, a genuine veto, exercised twice. It was defeated by an exclusionary-zoning lawsuit settled in closed session rather than by the absence of authority. The clearest case in the index of a veto point that existed and was litigated around.
Local sentiment not published. Locality gates pass, but no per-category D_local was supplied. Code the local subset and re-run.
Where this market sits
Every market GridSight has scored, on sentiment against absolute loudness.
A market can be quiet and negative, or loud and mixed. Those are different situations and
they call for different responses. Loudness is scaled against fixed references rather than
against the loudest market scored, so adding a market does not move anyone else's position.
Market
Sentiment
Loud
Norm
Scope
Veto
Outcome
Saline Township, MI
29
89
94
county › state
binding
Not approved ⚖
Nashville, TN
31
78
41
hyper-local › county
binding
Not approved ⚖
Hanover County, VA
35
65
83
county › county
binding
Not approved
Effingham County, GA
37
68
77
county › state
none
Approved, contested
New Albany / Licking County, OH
40
63
63
state › county
binding
Approved, contested
Charlotte, NC
41
72
75
hyper-local › county
binding
Delayed
Coweta County, GA
41
84
127
county › county
binding
Approved, contested ⚖
Box Elder County, UT
44
98
69
state › state
none
Delayed
Memphis metro, TN / MS
44
86
61
hyper-local › national
conditional
Approved, contested ⚖
Richland Parish, LA
51
76
12
state › state
none
Approved, contested
Concern categories
Scored categories, highest concern first. Select any row to read the underlying evidence and how it was scored.
Data disclosure
Digital intensity is scored from a validated Reddit pull, 123 topic-relevant posts across r/AnnArbor and r/Michigan spanning Aug 2025 to Aug 2026, carrying 16,004 upvotes and 6,288 comments, combined with Google Keyword Planner data pulled 2026-08-27. Posts from r/technology were reviewed and excluded from scoring: national-subreddit discussion is not local sentiment, and counting it would inflate every category in a market that already exports its fight.
▶Zoning / Process93
The strongest public-record signal in any market scored to date, and multi-venue. Planning Commission and Township Board denied the rezoning 4-1 on 9/10/2025; Related sued for exclusionary zoning two days later; the Board settled 4-1 after a closed session; the parcel was rezoned 1/14/2026; then on 1/28/2026 the Board rescinded the rezoning and reverted the map to agricultural specifically to extinguish the citizens' referendum trigger under the Zoning Enabling Act. 'What does it look like when residents are not able to determine what happens in their communities?'. DIGITAL: Ten local threads carrying 2,242 upvotes at an average 0.94 upvote ratio. The highest consensus of any scored category, meaning the procedural grievance is not contested locally the way most issues are. The defining artefact is Fortune's 'A Michigan farm town voted down plans for a giant OpenAI-Oracle data center. Weeks later, construction began' (550 upvotes, 205 comments). Search adds a striking detail: what is a consent judgment runs 480 a month and is up 23%, while saline township referendum returns no data at all. People are looking up the legal instrument that beat them, not the mechanism they lost.
Public record 100 · Digital 80 · weight 15.8% · 32 evidence items
▶Electricity / Grid Rate Impact92
MPSC Case U-21990 drew more than 5,500 public comments. The single best quantitative sentiment datapoint available in this market. AG Nessel's Court of Appeals challenge was filed 4/17/2026 and briefed 8/10/2026, with Earthjustice, Sierra Club, MEC and NRDC participating. A contested $300M savings claim runs against 'half a billion in up-front costs.'. DIGITAL: The dominant digital theme by a wide margin: 34 local threads, 7,970 upvotes, 2,455 comments. 'Fed up with DTE, data centers and Flock throwing their money at our Michigan politicians to our detriment' (872), 'DTE Energy proposes nearly $500 million rate increase' (739), 'DTE ties 10% proposed rate hike tied to data center' (530), 'Would DTE cut our electricity to power a data center?' (222). Search is near-silent on the same subject: will my dte bill go up and dte data center rate impact both return no data, so this concern lives almost entirely in social, not in search.
Public record 90 · Digital 95 · weight 25.6% · 52 evidence items
▶Water80
A pending EGLE permit to discharge into the Saline River closed its comment period 8/24/2026, with the City of Saline formally demanding load figures it has not received. The sharpest available hook: the groundwater permit authorizes 681 gpm (~980,000 gal/day) against a stated anticipated use of ~20,000 gal/day, roughly 49x headroom. This is a well-water-dependent community. DIGITAL: The single highest-scoring post in the entire market is a water post: 'The Saline data center wants to pollute our watershed, shocker': 1,216 upvotes, 0.98 ratio, 165 comments, posted 2026-07-30 and directing readers to the EGLE comment portal before the 8/24 deadline. Nineteen threads, 3,894 upvotes. Note that saline river runs 880 searches a month but is flat with 0% year-over-year change: that is the river's own geographic baseline, not a data center signal.
Public record 75 · Digital 90 · weight 13.8% · 28 evidence items
▶NDAs / Secrecy78
Heavily redacted DTE contracts, ex parte approval, a two-hour closed-session settlement vote, deficient public notice, and an Open Meetings Act lawsuit. Nessel objected to being asked to accept the deal 'without being able to see the full, unredacted contract.'. DIGITAL: Four threads, 1,053 upvotes, at a 0.972 average upvote ratio. The tightest consensus in the market. 'DTE asks regulators to fast-track data center, skip public hearings' (276) and the editorial 'DTE and Saline data center developer want a rubber stamp, not a review' (214). Small in volume, near-unanimous in direction.
Public record 80 · Digital 75 · weight 7.4% · 15 evidence items
▶Anti-corporate sentiment67
Explicit and named: 'tech billionaires who are seizing power' (Rabhi); 'corporate welfare' (DeSana). The framing is externalized cost rather than the technology itself. DIGITAL: Five threads but 1,857 upvotes. The highest upvotes-per-post of any category, meaning it is not a frequent frame but it is the one that lands hardest when used. The framing is money in politics rather than the technology.
Public record 60 · Digital 80 · weight 5.9% · 12 evidence items
▶Wildlife / Land65
575 acres of farmland with a 47.5-acre wetland conservation easement and ~200 acres preserved. Habitat loss was cited directly at the September 2025 hearing. Resident Marion: 'We're a farming rural township, and that's what we want to stay.'. DIGITAL: Five threads, 956 upvotes. The farmland frame is present and emotionally central to residents quoted in coverage, but it does not drive the volume that rates and water do.
Public record 70 · Digital 55 · weight 6.4% · 13 evidence items
▶Noise56
Both prospective and realized. The consent judgment caps property-line noise at 55 dB and restricts generator testing; separately, named residents filed construction-phase truck noise complaints in 2026, with Oracle responding by citing the 55 dB cap. DIGITAL: One local thread, 'Infrasound pollution around datacenters', 150 upvotes, 76 comments, but the search signal is unambiguous: data center noise complaints runs 110 a month, up 600% year over year. Noise here is realized rather than anticipated, which is what construction-phase markets look like.
Public record 60 · Digital 50 · weight 3.4% · 7 evidence items
▶Traffic43
Realized rather than anticipated: hundreds of gravel haulers daily on Michigan Avenue, named resident complaints, and a developer commitment to finish gravel deliveries by spring. DIGITAL: One thread, 18 upvotes. Realized in the public record through gravel-hauler complaints, but almost invisible digitally.
Public record 55 · Digital 20 · weight 3.0% · 6 evidence items
▶Anti-AI sentiment40
Present but usually fused with anti-corporate framing rather than standing alone. 'Uniquely evil' (LeBaron) is the sharpest instance. Reads as national commentary imported locally, not a local organizing frame. DIGITAL: Seven threads, 1,409 upvotes, led by MLive's 'Uniquely evil' (300). Real, but usually fused with anti-corporate framing rather than standing alone. National context cuts against escalation: is ai bad for the environment runs 18,100 a month but is down 18% year over year and down 18% over three months: national AI-environment concern is past its peak.
Public record 30 · Digital 60 · weight 4.9% · 10 evidence items
▶Schools / Children35
Real but inverted. The evidence is a fact-check debunking the developer's $8M/year schools claim. MSU's David Arsen: 'There really isn't any advantage for additional revenue for local school districts,' because local property tax gains are offset dollar-for-dollar by the state School Aid Fund. No child-health or school-siting concern found. DIGITAL: Fifteen threads but only 203 upvotes between them at a 0.683 average ratio: high frequency, near-zero engagement, and contested where it does appear. Search returns nothing. This is a talking point, not a live concern.
Public record 40 · Digital 25 · weight 9.4% · 19 evidence items
▶Health30
Weak-moderate. Air quality and generator emissions are mentioned generically in MPSC comments; the consent judgment constrains emissions. No epidemiological claim, no named health study, no health-specific organizing. DIGITAL: Two threads, and the concern arrives through air quality and emissions rather than any epidemiological claim. Consistent with the public record: no named health study, no health-specific organizing.
Public record 25 · Digital 40 · weight 2.5% · 5 evidence items
▶Location / Disaster Risk16
Weak. Adjacency to the Saline River and wetlands appears as a contamination concern, not a disaster-risk one. No flood, seismic or grid-failure framing found. DIGITAL: No digital signal. Consistent with the public record, where river adjacency reads as a contamination concern rather than a disaster-risk one.
Public record 20 · Digital 10 · weight 2.0% · 2 evidence items
Context flag : Cross-market spillover
Very strong, and running outward rather than inward. EDRA of Michigan tracks 34+ Michigan communities in data center conflict; 28 officials across 8 communities have faced recalls. The Augusta Township referendum (8/4/2026) and the Lyon Township, Mason and Marshall fights explicitly cite Saline as precedent. Saline is now the exporter of the pattern, which is a different index posture from being a recipient of it. The digital data confirms it: 18 local threads carrying 3,201 upvotes reference Augusta Township, Howell, Ypsilanti or the statewide pattern, and augusta township data center holds 90 searches a month on its own. Saline is the reference case other Michigan townships cite.
No evidence found
Unknown, not absent. These concerns were searched for in this market and no supporting evidence was located.
Property ValuesE-Waste
The economic case
Stated for this project
Construction jobs
2,500 union construction jobs (Gov. Whitmer)
Permanent jobs
450+ permanent on site, 1,500 more in the community
Township revenue
~$650K to ~$1.6M/yr: developer framed as 'quadruple tax revenue'
Tax revenue
$1B over the lease term (OpenAI)
Community
$14M one-time; $10M Saline Recreation Center; up to $45M Codex credits
Comparable reference points : not specific to this project
Property tax at buildout
$8M/yr total, of which $2.9M school debt and $2.1M Washtenaw ISD
Abatement
12-year IFEC at ~50%; real property $1.311B, personal property $3.5B
Not disclosed
Unredacted DTE contract termsLoad figures requested by the City of SalineFinal investment figure (moved three times)PILOT agreement: none identified
Local coverage
The most substantive local reporting on this project, with each piece read for its overall posture toward it.