Data centers in Texas

Texas has 107 large data center projects in GridSight's tracker: 32 operating, 38 under construction and 37 proposed, as of August 29, 2026. Pacific Northwest National Laboratory's open atlas maps 186 existing data center facilities in the state. Most of Texas runs on its own grid, operated by ERCOT, the Electric Reliability Council of Texas.

107data center projects
38under construction
186existing facilities (PNNL)
3local moratoriums in place

What is happening in Texas right now

In June 2026 ERCOT reported about 474 GW of large-load interconnection requests, and roughly 90% of them were data centers. Senate Bill 6, signed in June 2025, directs the Public Utility Commission of Texas to set standards for new or expanded ERCOT connections above 75 MW.

On August 3, 2026, Governor Greg Abbott directed the PUCT and ERCOT to audit every data center in the interconnection process before any more are approved to move forward, and said projects that fail to comply will be denied connection to the grid. ERCOT postponed its Batch Zero study while it carries out the audit.

Data centers became a central issue in the 2026 governor's race. Gina Hinojosa, who won on November 3, campaigned on a moratorium on data center approvals until the Legislature passes new protections, and she takes office January 19. Governor Abbott's campaign said data centers must pay their own way and pledged to work with the Legislature to write his standards into law. The Legislature convenes in January.

Locally, Texas has fewer data center moratoriums than Ohio, Michigan or Georgia, but the number is growing. Hill County adopted a pause in May 2026 and rescinded it in June after a developer filed a $100 million federal lawsuit.

GridSight has not yet scored a Texas market. Ask for a read on any project below.

Where Texas data centers are

By county, the most projects are in Dallas County (15), Collin County (7), Travis County (6), Bexar County (5) and Ellis County (4). The largest proposal by announced capacity is GW Ranch by Pacifico Energy in Pecos County, at 7,650 MW.

CountyOperatingUnder constructionPermittedProposedTotal
Dallas County1110315
Collin County52007
Travis County51006
Bexar County41005
Ellis County12014
Pecos County00033
Reeves County01023
Tarrant County20002

Local data center moratoriums in Texas

3 Texas jurisdictions have a data center moratorium in place and 3 more are considering one. See what happens when moratoriums end.

JurisdictionTypeStatusAdopted
Austin CountyCountyIn placeJul 2026
BrownsvilleCityIn placeNov 2026
Hays CountyCountyIn placeJun 2026
DentonCityUnder consideration
Fort WorthCityUnder consideration
LubbockCityUnder consideration
HarlingenCityExpiredJun 2026
Hill CountyCountyRescindedMay 2026
LavonCityStatus unclear

State data center policy in Texas

MeasureStatusLast actionWhat it does
Governor Abbott August 3, 2026 Data Center Audit DirectiveIssuedAug 2026Directs PUCT and ERCOT to conduct a comprehensive verification and audit of all data centers advancing through ERCOT interconnection before additional data centers are approved to move forward.
SB 6 (89R, 2025)EnactedJun 2025Directs PUCT standards for new or expanded ERCOT interconnections exceeding a single-site demand threshold of 75 MW unless PUCT determines a lower threshold necessary.
SB 1929 (88R, 2023)EnactedJun 2023Requires registration and ERCOT-related oversight for large interruptible virtual currency mining facilities.

8 other data center bills introduced in Texas since 2023 died without passing.

Every large data center project in Texas

All 107 projects in the tracker, operating first. Search and filter them in the tracker.

ProjectLocationStatusCapacity
Aligned DFW-01Aligned Data CentersPlano, Collin CountyOperating60 MW
Aligned DFW-03Aligned Data CentersMansfield, Tarrant CountyOperating
Core Scientific Austin Data Center (Austin 1)Core ScientificAustin, Travis CountyOperating200 MW
CyrusOne DFW3-DFW5 (Allen)CyrusOneAllen, Collin CountyOperating50 MW
CyrusOne SAT1 (San Antonio)CyrusOneSan Antonio, Bexar CountyOperating
CyrusOne SAT2-SAT4 (San Antonio)CyrusOneSan Antonio, Bexar CountyOperating
Digital Realty AUS11Digital RealtyAustin, Travis CountyOperating
Edged Dallas (Irving)Edged EnergyIrving, Dallas CountyOperating24 MW
Element Critical Austin OneElement CriticalAustin, Travis CountyOperating5 MW
Equinix Dallas DA11EquinixDallas, Dallas CountyOperating
Flexential Dallas: Downtown DallasFlexentialDallas, Dallas CountyOperating
Flexential Dallas: PlanoFlexentialPlano, Collin CountyOperating13 MW
Flexential Dallas: RichardsonFlexentialRichardson, Dallas CountyOperating
Google Red Oak CampusGoogleRed Oak, Ellis CountyOperating
Helios (Galaxy Digital / CoreWeave)Galaxy DigitalAfton, Dickens CountyOperating800 MW
Lancium Clean Campus (Crusoe / Stargate Site 1)CrusoeAbilene, Taylor CountyOperating1,200 MW
Lumen Austin 1Lumen TechnologiesAustin, Travis CountyOperating
Lumen Austin 3Lumen TechnologiesAustin, Travis CountyOperating
Lumen Dallas 1Lumen TechnologiesDallas, Dallas CountyOperating
Lumen Dallas 6Lumen TechnologiesDallas, Dallas CountyOperating
Lumen San Antonio 2Lumen TechnologiesSan Antonio, Bexar CountyOperating
Meta Fort Worth Data CenterMetaFort Worth, Tarrant CountyOperating
Meta Temple Data CenterMetaTemple, Bell CountyOperating152 MW
NTT Global Data Centers Dallas TX1NTT Global Data CentersGarland, Dallas CountyOperating
Prime DFW01-01Prime Data CentersDallas, Dallas CountyOperating8 MW
QTS Irving 1QTS Data CentersIrving, Dallas CountyOperating165 MW
Skybox Houston OneSkybox DatacentersKaty, Harris CountyOperating26 MW
STACK DFW01 (Plano)STACK InfrastructurePlano, Collin CountyOperating80 MW
Stream Data Centers DFWA (DFW VII)Stream Data CentersGarland, Dallas CountyOperating43 MW
TierPoint DallasTierPointDallas, Dallas CountyOperating
TierPoint Dallas-AllenTierPointAllen, Collin CountyOperating
Vantage San Antonio TX11Vantage Data CentersSan Antonio, Bexar CountyOperating
Aligned Data Centers Project CaprockAligned Data CentersAbernathy, Hale CountyUnder construction540 MW
AUS02 / Cedar Creek CampusEdgeConneXCedar Creek, Bastrop CountyUnder construction384 MW
BlockchAIn Collin County AI GPU Hosting SiteBlockchAIn Digital Infrastructure, Inc.Collin CountyUnder construction
Cipher Barber Lake CampusCipher DigitalColorado City, Mitchell CountyUnder construction300 MW
Cipher Black Pearl CampusCipher DigitalWink, Winkler CountyUnder construction300 MW
Cipher Stingray HPC Data CenterCipher DigitalAndrews, Andrews CountyUnder construction100 MW
CloudBurst San Marcos GigaCenterCloudBurst Data CentersSan Marcos, Hays CountyUnder construction1,200 MW
Core Scientific Denton Data Center (Denton 1)Core ScientificDenton, Denton CountyUnder construction260 MW
Core Scientific Pecos AI CampusCore ScientificPecos, Reeves CountyUnder construction1,500 MW
CyrusOne Bosque County Campus (Thad Hill Energy Center)CyrusOneBosque CountyUnder construction400 MW
CyrusOne Freestone Energy Center CampusCyrusOneFairfield, Freestone CountyUnder construction760 MW
Fluidstack Abernathy AI CampusFluidstackAbernathy, Hale CountyUnder construction168 MW
Galaxy Helios Data Center CampusGalaxy DigitalAfton, Dickens CountyUnder construction1,630 MW
Goodnight CampusGoogle / CrusoeClaude, Armstrong CountyUnder construction933 MW
Google Haskell County Data Center CampusGoogleHaskell, Haskell CountyUnder construction
Google Meitner Energy CenterGooglePampa, Gray CountyUnder construction
Google Wilbarger County CampusGoogleVernon, Wilbarger CountyUnder construction
Hut 8 Beacon Point AI CampusHut 8Robstown, Nueces CountyUnder construction352 MW
IREN Horizon: Childress, TXIREN (Iris Energy)Childress, Childress CountyUnder construction750 MW
IREN Sweetwater CampusIREN (Iris Energy)Sweetwater, Nolan CountyUnder construction2,000 MW
Lambda Plano AI Data Center (Aligned DFW-04)LambdaPlano, Collin CountyUnder construction100 MW
Meta El Paso AI Data Center CampusMetaEl Paso, El Paso CountyUnder construction1,000 MW
Microsoft San Antonio SAT89/SAT90 Data CentersMicrosoftCastroville, Medina CountyUnder construction
Nexus Hubbard Data Center & Power CampusNexus Data CentersHubbard, Hill CountyUnder construction612 MW
PowerHouse Grand Prairie CampusPowerHouse Data CentersGrand Prairie, Ellis CountyUnder construction1,800 MW
Project MatadorFermi AmericaAmarillo, Carson CountyUnder construction
Red Oak CampusDataBankRed Oak, Ellis CountyUnder construction480 MW
RELLIS Data and Research CenterThisWay Global, Inc.Bryan, Brazos CountyUnder construction
Rowan Project TempleRowan Digital InfrastructureTemple, Bell CountyUnder construction300 MW
Soluna Project GraceSoluna HoldingsSilverton, Briscoe CountyUnder construction2 MW
Soluna Project KatiSoluna HoldingsRaymondville, Willacy CountyUnder construction166 MW
STACK DFW02 (Lancaster)STACK InfrastructureLancaster, Dallas CountyUnder construction500 MW
Stargate AbileneOpenAI / Oracle / CrusoeAbilene, Taylor CountyUnder construction1,200 MW
Stargate Milam County CampusOpenAI / SoftBank (SB Energy)Milam CountyUnder construction1,200 MW
Switch: The Rock (Round Rock)SwitchRound Rock, Williamson CountyUnder construction185 MW
Tesla Cortex 2.0 AI Training Cluster (Giga Texas)TeslaAustin, Travis CountyUnder construction500 MW
Vantage Frontier CampusVantage Data CentersShackelford CountyUnder construction1,400 MW
Vantage San Antonio TX22Vantage Data CentersSan Antonio, Bexar CountyUnder construction
Amazon Pecos County Data Center CampusAmazon Data Services, Inc.Pecos CountyProposed
AWS Project Eagle (Wharton County)Amazon Data Services, Inc.Boling, Wharton CountyProposed
AWS Project Spectrum (Somervell/Hood County)Amazon Data Services, Inc.Somervell CountyProposed
BlockchAIn Reeves County AI GPU Hosting SiteBlockchAIn Digital Infrastructure, Inc.Reeves CountyProposed
Cipher Colchis CampusCipher DigitalSan Angelo, Tom Green CountyProposed1,000 MW
Cipher McLennan HPC Data CenterCipher DigitalWaco, McLennan CountyProposed500 MW
Cipher Mikeska HPC Data CenterCipher DigitalBrady, McCulloch CountyProposed
Cipher Milsing HPC Data CenterCipher DigitalHuntsville, Walker CountyProposed
Cipher Reveille HPC Data CenterCipher DigitalCotulla, La Salle CountyProposed70 MW
CleanSpark Austin County AI Data Center CampusCleanSpark, Inc.Austin CountyProposed285 MW
CleanSpark Brazoria County (Second Texas) CampusCleanSpark, Inc.Brazoria CountyProposed300 MW
Comanche CircleSailfish Digital Ventures (SDV)Tolar, Hood CountyProposed2,000 MW
Crow Holdings Stemmons Corridor Data Center CampusCrow Holdings (developed and leased by CleanArc Data Centers)Dallas, Dallas CountyProposed245 MW
Crusoe Nolan County Data CenterCrusoe Energy SystemsSweetwater, Nolan CountyProposed200 MW
Crusoe Victoria AI FactoryCrusoeVictoria, Victoria CountyProposed1,500 MW
Data City, TexasEnergy Abundance Development CorporationLaredo, Webb CountyProposed5,000 MW
Equinix Dallas DA12 (West Dallas)EquinixDallas, Dallas CountyProposed
Flexential Kaufman County Campus (Talty)FlexentialTalty, Kaufman CountyProposed108 MW
Fort SpunkyPacifico EnergyHood CountyProposed100 MW
GW RanchPacifico EnergyPecos CountyProposed7,650 MW
Microsoft Irving Data CentersMicrosoftIrving, Dallas CountyProposed
Microsoft Pecos Data Center CampusMicrosoftPecos, Reeves CountyProposed2,000 MW
Poolside Project Horizon AI CampusPoolside AIPecos CountyProposed2,000 MW
PowerHouse Caldwell County Data CenterPowerHouse Data CentersUhland, Caldwell CountyProposed4,000 MW
Project AquilaRCM Hill, LLCHill CountyProposed1,235 MW
Project Merlin (Helios II)Galaxy DigitalMcGregor, McLennan CountyProposed3,500 MW
Prometheus Hyperscale Kaufman County CampusPrometheus HyperscaleKaufman CountyProposed200 MW
QumulusAI Denton Modular Data CenterQumulusAI, Inc.Denton, Denton CountyProposed20 MW
Red Oak CampusCompass DatacentersRed Oak, Ellis CountyProposed
Site MAT 1177MARA HoldingsMatagorda CountyProposed1,000 MW
Soluna Project AnnieSoluna HoldingsParis, Lamar CountyProposed75 MW
Soluna Project EllenSoluna HoldingsRio Hondo, Cameron CountyProposed100 MW
Soluna Project FeiSoluna HoldingsChildress, Childress CountyProposed100 MW
Telios Quinlan CampusCore ScientificQuinlan, Hunt CountyProposed430 MW
Texas Critical Data Centers (TCDC)Sharon AI + New Era Energy & Digital (joint venture)Ector CountyProposed250 MW
Tract Caldwell Valley Technology ParkTractUhland, Caldwell CountyProposed2,000 MW
Westline Site / Dove Creek Technology CampusBeacon Data Centers (via Westline TX Holdings)San Angelo (Tankersley area, unincorporated), Tom Green CountyProposed

Questions

How many data centers are in Texas?

GridSight tracks 107 large data center projects in Texas: 32 operating, 38 under construction and 37 proposed, as of August 29, 2026. Pacific Northwest National Laboratory's open atlas maps 186 existing facilities, counting each campus once. Directories that include small colocation and enterprise sites count more, because there is no official count.

Where are most data centers in Texas?

By county, the most projects are in Dallas County (15), Collin County (7), Travis County (6), Bexar County (5) and Ellis County (4). The largest proposal by announced capacity is GW Ranch by Pacifico Energy in Pecos County, at 7,650 MW.

How many data centers are being built in Texas?

38 large data center projects are under construction in Texas. Another 37 are proposed.

Is there a data center moratorium in Texas?

There is no statewide moratorium in law. Governor Abbott's August 3, 2026 audit directive pauses new data center approvals in the ERCOT interconnection process until the audit is complete, and Governor-elect Gina Hinojosa has pledged a moratorium on approvals until the Legislature acts. Locally, 3 Texas jurisdictions have a data center moratorium in place and 3 more are considering one.

How much power do Texas data centers need?

In June 2026 ERCOT reported about 474 GW of large-load interconnection requests, roughly 90% of them from data centers. Many requests will never be built, which is why ERCOT and the PUCT are now verifying projects before they move forward. The 71 Texas projects in this tracker with announced capacity add up to about 60 GW.

Sources

Project data from the August 2026 open release of Compute Atlas, CC BY 4.0. Existing facilities from the IM3 Open Source Data Center Atlas, Pacific Northwest National Laboratory, version of November 2, 2026, © OpenStreetMap contributors, ODbL. Local moratoriums and state measures from Moratorium Nation by Michael J. Bommarito, CC BY 4.0. Reviewed November 16, 2026.